Blog Directory logo  Blog Directory
           Submit a Blog
  •  Login
  • Register
  • Submit a Blog in Featured for only $10 with PaypalFeatured BlogsBlog Listing
    Member - { Blog Details }

    hero image

    blog address: https://besten.in/2021/05/are-as-built-drawings-essential-in-industrial-projects/

    keywords: Industrial Infrastructure Design consultants, Industrial Architects, Industrial Civil Consultants, Industrial infrastructure design consultants,

    member since: Aug 21, 2021 | Viewed: 847

    What are As-Built Drawings?

    Category: Business

    Industrial projects are complex and challenging projects. Each construction project especially an industrial project has many drawings of various disciplines. During the construction stage due to certain challenges at the site, there may be certain changes that have to be made. The design consultant or architect will incorporate the deviations in the GFC drawings and submit them as “As-Built” drawings. These drawings or As fitted drawings or As made drawings as they are also called are a set of records of the completed project and thus an important set of project documents. It is necessary to store these drawings safely for future projects.



    { More Related Blogs }
    © 2025, Blog Directory
     | 
    Google Pagerank: 
    PRchecker.info
     | 
    Support
    VISUAL ERP Software Blog

    Business

    VISUAL ERP Software Blog...


    Nov 7, 2014
    Efficient HR and Payroll Software in Manama

    Business

    Efficient HR and Payroll Softw...


    Sep 26, 2024
    Galileo Global Distribution System

    Business

    Galileo Global Distribution Sy...


    Jun 6, 2022
    HI5 Auto Lenders

    Business

    HI5 Auto Lenders...


    Jan 8, 2024
    Streamline Payroll Management: Best HR Payroll Software UAE

    Business

    Streamline Payroll Management:...


    Apr 5, 2024
    Why Aadhaar based eSign is prominent?

    Business

    Why Aadhaar based eSign is pro...


    Oct 25, 2023
               Submit a Blog