blog address: https://bsmechdesign.com.au/why-clash-detection-saves-projects-from-costly-delays/
keywords: clash detection, 3d design, B&S Mech Design,
member since: Feb 16, 2026 | Viewed: 7
Category: Business
The Hidden Cost of Construction Errors In any construction project, one of the biggest risks is discovering errors on-site. An HVAC duct colliding with a structural beam, a pipe cutting through an electrical route – these mistakes may sound minor, but fixing them during construction costs time, money, and resources. Delays caused by such clashes can spiral into major financial setbacks.
Business
Business
Business
Business
Business
Business